Starting 2026 with key progress at WWTP La Farfana in Chile ??
We’re excited to share our involvement in one of Santiago’s most important wastewater treatment projects: the equipment coverage at WWTP La Farfana, one of the largest plants in the city of Santiago. It treats 50% of the capital’s wastewater, with an average flow of 9 m³/s, serving over 3.7 million people.
For this project, we covered more than 4,499.9 m² using high-performance aluminum solutions:
We designed, manufactured, and supplied: (3) alusphere® domes (Ø31.30 m) and (4) alugreca® covers (Ø26.50 m), delivering solutions that offer:
•High durability and low maintenance
• Self-supporting structures for fast and efficient installation
• Odor and emissions control
• Flexible design with removable sections to ease maintenance
This project reflects our ongoing commitment to providing advanced technical solutions for critical infrastructure, bringing innovation, excellence, and efficiency from concept to delivery.